When paving Jiusheng floor, pay attention to damp

2022-07-22
  • Detail

As a professional large-scale solid wood flooring manufacturing enterprise, Jiusheng flooring participated in the drafting of the national standard of "code for acceptance of wood flooring pavement", and took the lead in implementing "digitization" of the pavement specification in the industry

seven points of quality, three points of pavement. If the paving is not professional, the floor will be deformed. The reason is very simple: the paving requirements of solid wood floors are related to the internal performance of wood species, the temperature and humidity of the use space. In fact, different floor paving environments have different installation requirements, and different paving schemes need to be selected according to data control throughout the process. As a professional large-scale solid wood flooring manufacturing enterprise, Jiusheng flooring participated in the drafting of the national standard of "code for acceptance of wood flooring pavement", and took the lead in implementing "digitization" of the pavement specification in the industry

one, six no paving

1, the floor is not dry (wet), not clean

2, there are termites in the surrounding environment

3, cross mixed operation on the construction site

4, use low-quality, polluted, wet, perishable materials as keels

5, the construction period is too short to implement the process

6, the user requires absolute flatness, no color difference

two, construction requirements and fixed keels

1, do moisture-proof and insect proof before construction.Processing, Sprinkle insect proof powder first, and then lay moisture-proof paper (film)

2. When keel laying method is adopted, the keel and auxiliary materials must be dry, and inferior, polluting, moist, perishable and moth prone materials cannot be used as keel auxiliary materials, otherwise construction cannot be carried out

3. When plywood (thick plywood) is used for laying, the thickness of plywood is more than 9mm. It is best to use anti-corrosion paint for anti-corrosion treatment of plywood, leave a gap of about 20mm between each plywood, and nail it firmly on the ground

III. floor paving

1. Overall trial paving: allocate the color difference of the floor. The floor with similar patterns and colors can be placed in the living room, aisle or obvious place, and the slightly different ones can be placed under the furniture or at the corner, so as to achieve overall aesthetic coordination

2. When laying the floor, an expansion joint of more than 8-12mm shall be reserved between the floor and the wall. According to the local conditions, a corresponding expansion joint of 0.2-0.6mm shall be reserved between the floor and the floor. In the dry northwest, North China and northeast regions, natural splicing is generally the best between floors

3. When nailing is required for laying the floor, use special nails for the floor to drive obliquely

IV. floor acceptance

1. The acceptance is usually within 3 days after the completion of floor installation

2. The floor surface should be clean and flat. The appearance quality of the floor meets the requirements of corresponding product standards

3. The butt joint is at 1/2 or 1/3 of the length of the adjacent row of floor slabs

4. The floor should be firmly laid without looseness and no abnormal sound when treading

it is worth noting that after the solid wood floor is paved, it can be used only after curing for at least 24 hours, otherwise it will affect the use effect of the solid wood floor. Generally, the water resistance of solid wood floor is poor. It is not suitable to wipe it with wet cloth or water to avoid losing luster